Project Portfolio

500+ Completed HVAC Projects Across Bangladesh

From a single-room split AC to a 2,000-tonne industrial chiller plant — over 20 years and 500 completed projects across every major sector in Bangladesh. A selection of our work is featured below.

500+ Completed Projects
20+ Years of Experience
64 Districts Covered
2,000 TR Largest Single Installation
Sector: Garments & TextilesHealthcareCommercial Real EstateData Centres & ITHotels & HospitalityIndustrial ManufacturingEducation
Healthcare 2022

Hospital HVAC Overhaul — Dhaka Medical Complex

Private Hospital Group, Dhaka

Full HVAC system replacement for a 6-storey 300-bed hospital, including ASHRAE 170-compliant sterile air handling units for two operating theatres, ward VRF systems, and cold-room cooling for the hospital pharmacy and blood bank.

VRF + AHU System6 FloorsASHRAE 170 Compliant300-bed HospitalPharmacy Cold RoomBlood Bank Cooling
Commercial Real Estate 2022

Central Chilled Water Plant — Gulshan Tower, Dhaka

Commercial Developer, Gulshan

VRF heat-recovery system for a 12-storey mixed-use office and retail building in Gulshan-2. 64 indoor zones with independent temperature control per floor. Heat recovery from cooling used in lobby and common-area heating during winter months.

VRF Heat Recovery64 Indoor Zones12 Floors3-Pipe SystemSamsung VRFBMS Integrated
Garments & Textiles 2023

Factory Comfort Cooling — Textile Mill, Narayanganj

Textile Manufacturer, Narayanganj

Precision cooling for 4 spinning and weaving halls in a 180,000 sq ft textile mill. Temperature and humidity control critical to yarn quality. Split-chiller system with dedicated AHUs for each production hall.

180,000 sq ft4 Production HallsHumidity ControlledAHU SystemPrecision CoolingAchelous Chillers
Data Centres & IT 2021

Precision AC — Data Centre, Motijheel, Dhaka

Telecom Operator, Dhaka

Precision air conditioning for a Tier-3 data centre handling national telecom infrastructure. Redundant N+1 close-control units maintaining 22°C ±1°C year-round with humidity control. Full UPS-integrated power with generator backup.

N+1 Redundancy22°C ±1°CHumidity ControlUPS IntegratedTier-3 Spec24/7 Monitoring
Hotels & Hospitality 2020

Full HVAC — 5-Star Hotel, Banani, Dhaka

International Hotel Group, Dhaka

Complete HVAC solution for a 180-room 5-star hotel in Banani including guest-room VRF cassette units, lobby AHU with fresh air handling, banquet hall split systems, kitchen exhaust and make-up air, and laundry ventilation.

180 RoomsVRF + AHULobby SystemKitchen ExhaustBanquet HallDunham Bush Chillers
Industrial Manufacturing 2022

Chiller Plant — Pharmaceutical Factory, Tongi

Pharmaceutical Manufacturer, Tongi

Controlled-environment cooling for 5 pharmaceutical production cleanrooms and a separate API synthesis area. Required GMP-compliant HVAC with validated performance documentation and qualification protocols (IQ/OQ/PQ).

GMP Compliant5 CleanroomsIQ/OQ/PQ DocsAPI Area CoolingZeus Air ChillersValidated Performance
Education 2021

Campus HVAC — Private University, Dhaka

Private University, Dhaka

Phased HVAC upgrade across a 5-building university campus. Replaced 180 ageing window ACs with centralised VRF systems in academic buildings. Lecture theatres fitted with cassette units and fresh air handling. Administration block fitted with ducted central AC.

5 Buildings180 Units ReplacedVRF SystemLecture TheatresDucted Admin BlockGree VRF
Commercial Real Estate 2019

Central Plant — Shopping Mall, Chattogram

Mall Developer, Chattogram

1,200-tonne central chilled-water plant for a 6-floor regional shopping centre in Chattogram. Two 600 TR Dunham Bush PROmetheus centrifugal chillers operating in lead-lag configuration with N+1 redundancy. Full BMS control.

1,200 TR Total2x 600 TR ChillersCentrifugalN+1 RedundancyBMS Integrated6-Floor Mall
Industrial Manufacturing 2023

Process Cooling — Electronics Assembly, EPZ Dhaka

Electronics Manufacturer, EPZ

Temperature and humidity-controlled environment for SMD and PCB assembly lines in an export processing zone factory. Maintaining 23°C ±1°C and 45% RH ±5% across 40,000 sq ft assembly floor. ESD-safe environment design.

40,000 sq ft23°C ±1°C45% RH ±5%ESD SafeSMD AssemblyPrecision HVAC
Healthcare 2020

Dialysis Centre HVAC — Chittagong Medical College

Teaching Hospital, Chattogram

Dedicated HVAC installation for a 30-station haemodialysis centre, ICU expansion, and new surgical block. Humidity and temperature precision critical for patient safety. ASHRAE 170 compliance throughout.

30 Dialysis StationsICU ExpansionSurgical BlockASHRAE 170Precision HumidityZeus Chillers
Garments & Textiles 2024

VRF Upgrade — Garment Complex, Ashulia

RMG Group, Ashulia

Full VRF upgrade across 6 production floors for a 2,500-worker garment factory in Ashulia. Replaced 320 split ACs with modern Samsung VRF systems providing central control and 30% lower energy consumption.

6 Floors2,500 Workers320 Units ReplacedSamsung VRFCentral Control30% Energy Saving

Have a project in mind?

Tell us about your requirements. Our engineers will assess the scope and provide a detailed proposal.

WhatsApp Call Now